PRO NO. 645 |
645-1 | Health Department | (1) Annual Rate Contract for Supply of Dried Grass for impounded Cattle. | 15-11-10 | 24-11-10 | 29-11-10 |  |
PRO NO. 647 |
647-1 | Exe. Engineer Central Workshop Department | (1) To purchase the spares for repairing of "Ashok Leyland" make Vehicle No. GRQ-6142. | 15-11-10 | 19-11-10 | 25-11-10 |  |
647-2 | As Above | (2) To repair "Marshal" make Paver Machine with Labour and spares from Registered Contractor's only. | 15-11-10 | 19-11-10 | 25-11-10 |  |
PRO NO. 648 |
648-1 | Exe. Engineer(Mech.)Mechanical Department | (1) To Repair of Ashok Leyland make Dumper No. GRQ-7753 from Registered Contractor's only. | 15-11-10 | 22-11-10 | 24-11-10 |  |
648-2 | As Above | (2) Mechanical Department To Repair of Vehicle No. GJ-6G-6148 from Registered Contractor's only. | 15-11-10 | 22-11-10 | 24-11-10 |  |
PRO NO. 650 |
650-1 | Solid Waste Management | (1) Collection of waste from door/gate & transportation and disposal of the same at identified site as per MSW rules 2000 for North Zone ward areas. | 16-11-10 | 29-11-10 | 07-12-10 |  |
650-2 | As Above | (2) Collection of waste from door/gate & transportation and disposal of the same at identified site as per MSW rules 2000 for East Zone ward areas. | 16-11-10 | 29-11-10 | 07-12-10 |  |
PRO NO. 651 |
651-1 | Exe. Engineer Water works | (1)Constructing Ramp of pumphouse at gayatrinagar OHT. | 15-11-10 | 22-11-10 | 26-11-10 |  |
651-2 | As Above | (2)Supply of spindle nut for 450 mm dia valve at Akota OHT. | 15-11-10 | 22-11-10 | 26-11-10 |  |
651-3 | As Above | (3)Rising level of existing valve chamber at Panigate and miscellance work inside pump house. | 15-11-10 | 22-11-10 | 26-11-10 |  |
651-4 | As Above | (4)Colour work on slab damage part at U.G. sump at karelibaug OHT. | 15-11-10 | 22-11-10 | 26-11-10 |  |
651-5 | As Above | (5)Earth filling work near Rayka Sub Station Bore and on road towards Substation. | 15-11-10 | 22-11-10 | 26-11-10 |  |
PRO NO. 652 |
652-1 | PARKS & GARDEN | (1) Labour supply for maintance work in t p 13 nr,chhani canal. | 15-11-10 | 19-11-10 | 23-11-10 |  |
652-2 | As Above | (2) Maintenance work for plantation of deyader in different area of city. | 15-11-10 | 19-11-10 | 23-11-10 |  |
652-3 | As Above | (3) Proving & fixing M.s get in shree sayajibaug near wagh khana. | 15-11-10 | 19-11-10 | 23-11-10 |  |
PRO NO. 653 |
653-1 | Executive Engineer(Road Project) | (1) Reparing work of Way Bridge and Bitumin Rivarification and Stamping. | 15-11-10 | 20-11-10 | 26-11-10 |  |
No comments:
Post a Comment